Calibration of welding equipment is the controlled comparison of a machine meter or instrument against a traceable reference, so that the values an inspector records can be trusted. A weld record is only as reliable as the ammeter, thermocouple, gauge or flaw detector that produced it.
Quick AnswerCalibration of welding equipment means checking each measuring device and power source meter against a traceable reference, documenting the as-found and as-left results, and labelling the due date. Set the interval from criticality, usage and history, list every item in an equipment register, and assess product impact whenever an item is found out of tolerance.
Welding quality standards such as the ISO 3834 welding quality system expect equipment to be fit for purpose and measuring devices to be calibrated, with evidence kept in the welding documentation and record-keeping package. Many fabricators lose audit points here, not because instruments are missing, but because the register, labels, certificates and look-back procedure do not agree with each other.
This guide covers which welding and inspection equipment needs calibration, what the standards say, how to read a calibration certificate, how to set intervals, how to build a management system and what to do when an instrument is found out of tolerance. It includes a worked example showing how a small ammeter error changes recorded heat input, a decision flowchart and a quick-reference table you can adapt for your own procedure.

Figure 1: A welding power source checked with an independent clamp meter and marked with a calibration status label.
Key Takeaways- Calibration compares an instrument with a traceable reference and quantifies its error; verification and validation are separate activities that do not replace it.
- ISO 17662 is the standard dedicated to calibration, verification and validation of welding equipment, and ISO 3834 sets equipment control expectations that increase from Part 4 to Part 2.
- Many welding codes leave the interval to the manufacturer, so intervals come from criticality, usage, stability and calibration history unless a code or contract fixes them.
- A calibration certificate is only useful when it shows traceability, uncertainty, as-found data and a statement against the tolerance you actually require.
- When an instrument is found out of tolerance, every record made since its last good calibration must be traced and the product impact assessed.
- A unique instrument ID on each weld, PWHT and NDT record links every result to the calibration status of the instrument that produced it.
What Is Calibration of Welding Equipment and Why Does It Matter?
Calibration of welding equipment is the documented comparison of an instrument against a reference standard of known accuracy, under stated conditions, to find how far its readings deviate. The result shows whether a power source display, thermocouple, gauge or flaw detector can be trusted to show what the procedure requires.
DefinitionCalibration is a measurement activity that compares an instrument with a traceable reference to quantify the instrument’s error.
Welding procedures depend on measured values. Current, voltage, travel speed, preheat, interpass temperature, heat input, PWHT hold temperature, hardness and coating thickness are all limited by a WPS, a code or a specification. If the instrument that measures them drifts, production can move outside the qualified range while every record still shows compliance.
Calibration also protects acceptance decisions. A flaw detector with poor amplitude linearity, a magnetic yoke with too little lifting force or a test gauge reading low can each pass product that should have been rejected. The cost of finding this later is rework, re-inspection or, in the worst case, a failure in service.
What Is the Difference Between Calibration, Verification and Validation?
Calibration measures the error of an instrument against a traceable reference. Verification confirms that a requirement is still met between calibrations, and validation confirms that equipment is fit for its intended use. The three answer different questions, so one cannot stand in for another.
Table 1: Calibration, adjustment, verification and validation compared| Activity | What it answers | Welding example | Typical output |
|---|
| Calibration | How large is the instrument error against a traceable reference? | Clamp meter checked at several current points in an accredited laboratory | Certificate with as-found data and uncertainty |
|---|
| Adjustment | Can the error be reduced by setting the instrument? | Zeroing a thickness gauge on a calibration block | As-left data after adjustment |
|---|
| Verification | Does the instrument still meet the requirement today? | Lifting test of a magnetic yoke, or a hardness check on a reference block | In-house check record |
|---|
| Validation | Is the equipment suitable for the intended task under real conditions? | Consistency check of a power source output against the qualified parameters | Validation report |
|---|
ISO 17662 treats calibration, verification and validation as separate activities. The descriptions above are simplified, so check the wording of the edition cited in your contract.
Which Welding and Inspection Equipment Needs Calibration?
Any equipment whose reading is used to accept, release or record a welding or inspection result needs a defined calibration or verification status. That covers power source meters, temperature instruments, dimensional gauges, NDT instruments, test gauges and coating or environmental meters.

Figure 2: Typical inspection and measuring instruments that need calibration status control before use.
Table 2: Equipment groups, what is checked and the usual reference| Equipment group | Typical items | What is checked | Usual reference or method |
|---|
| Power sources and wire feeders | Current and voltage meters, wire feed speed display, gas flow meters | Display accuracy and repeatability of output | Calibrated clamp meter or shunt, voltmeter, timed wire-length check, calibrated flow meter |
|---|
| Temperature measurement | Contact thermometers, PWHT thermocouples, recorders, controllers, baking and holding ovens | Reading accuracy across the working range, recorder channels | Reference thermometer or temperature calibrator |
|---|
| Dimensional and weld gauges | Calipers, micrometers, tape measures, hi-lo gauges, fillet gauges | Accuracy, wear and damage | Gauge blocks, master gauges |
|---|
| Hardness and mechanical testing | Portable and bench hardness testers, tensile machine load cells | Reading on reference blocks, force accuracy | Certified reference blocks, force standards |
|---|
| NDT instruments | UT flaw detectors and probes, thickness gauges, MT yokes, UV-A radiometers, white light meters, densitometers | Linearity, lifting force, light intensity, density readings | Calibration blocks, test weights, calibrated meters, calibrated step wedge |
|---|
| Pressure test gauges | Hydrotest and pneumatic test gauges, recorders | Accuracy over the used range | Dead weight tester or calibrated master gauge |
|---|
| Coating and environmental | DFT gauges, surface profile gauges, dew point and humidity meters, surface thermometers | Reading on reference shims or foils, temperature accuracy | Reference shims, calibrated thermometer |
|---|
How Should Welding Power Sources Be Calibrated?
Welding power source calibration checks that the displayed current, voltage and wire feed speed match values measured by independent calibrated instruments. A display is indicative until it has been checked, so critical work should not rely on it alone.
For procedures with a tight heat input window, such as creep-resistant steels, duplex stainless steel or toughness-tested joints, record current and voltage with a calibrated meter or verify the machine display against one before production. Wire feed speed can be confirmed by measuring wire length over a timed interval. Shielding gas flow meters and regulators also need checking, because gas coverage depends on the real flow rate, as explained in the guide to MIG welding gas flow rate settings. Follow the manufacturer’s procedure and the arrangement described in ISO 17662 when the contract requires it.
How Are Temperature Instruments for Preheat, Interpass and PWHT Controlled?
Preheat, interpass and PWHT temperatures are controlled with contact thermometers, thermocouples, controllers and recorders that each need a valid calibration status. The measuring chain is only as good as its weakest part, so the thermocouple, extension lead and recorder should all be covered.
Temperature-indicating crayons and paints are different. They are consumable indicators with a melt temperature stated by the manufacturer, so control them by batch, storage and expiry rather than by calibration. For PWHT, write the instrument IDs on the chart and keep the certificates with the heat treatment record. The hold time you calculate with the PWHT soak time calculator is only valid if the recorded temperature is correct.
Which NDT and Inspection Instruments Need Routine Checks?
Instruments that decide acceptance need both periodic calibration and a check before use. Examples include UT flaw detectors and probes, thickness gauges, magnetic yokes, UV-A radiometers, white light meters and coating thickness gauges. The general overview of non-destructive testing methods shows where each of these instruments is used.
What Do the Standards Require for Equipment Calibration?
No single code sets one calibration rule for all welding equipment. Requirements come from the quality system standard, the welding standard, the NDT code and the contract, and they differ in how prescriptive they are.
Table 3: Documents that govern equipment calibration in welding fabrication| Document | Issuing body | Relevance to calibration |
|---|
| ISO 17662, Welding – Calibration, verification and validation of equipment used for welding, including ancillary activities | ISO | Dedicated standard for calibrating, verifying and validating welding equipment; also addresses the situation where other parties perform the activities |
|---|
| ISO 3834 (Parts 2, 3 and 4), Quality requirements for fusion welding of metallic materials | ISO | Sets requirements for equipment suitability and for calibration and validation of measuring equipment, with depth depending on the part |
|---|
| IEC 60974-14, Arc welding equipment – Calibration, validation and consistency testing | IEC | Technical requirements for calibrating and validating arc welding equipment; confirm the current edition and how your region references it |
|---|
| ISO 9001, clause on monitoring and measuring resources (7.1.5 in the 2015 edition) | ISO | Requires measuring resources to be calibrated or verified against traceable standards, identified, protected, and prior results assessed when equipment is found unfit |
|---|
| ISO 10012, Measurement management systems | ISO | Requirements and guidance for managing measurement processes, including metrological confirmation |
|---|
| ISO/IEC 17025, Competence of testing and calibration laboratories | ISO/IEC | Basis for accredited calibration laboratories and their certificates |
|---|
| ASME BPVC Section V, Nondestructive Examination | ASME | NDE articles specify calibration or verification of instruments, blocks, yokes and light meters, with intervals set by the article and edition |
|---|
| ASME BPVC Section VIII Division 1, UG-102 | ASME | Covers the range of test gauges and their calibration against a deadweight tester or calibrated master gauge |
|---|
| Client or project specification | Owner or EPC contractor | Often adds fixed intervals, accepted laboratories, label formats and notification of out-of-tolerance results |
|---|
The quality level chosen under ISO 3834 determines how formal the equipment control must be. For supplier audits, the article on auditing welding companies and suppliers shows where equipment control is assessed. ISO 9001 is also under revision, and the overview of the ISO 9001 revision is a useful starting point for quality system owners.
Primary documents are available from ISO and ASME. Always work to the edition named in the contract.
What Is Calibration Traceability and What Must a Certificate Show?
Calibration traceability is an unbroken chain of comparisons that links a shop instrument to national or international measurement standards, each link with a stated uncertainty. A certificate that does not show this chain does not prove that an instrument was calibrated to a recognised reference.
Figure 3: Traceability chain from international units to the weld and inspection records produced with a shop instrument.In India, calibration laboratories are accredited to ISO/IEC 17025 by NABL, and many other countries have equivalent bodies. Recognition between accreditation bodies runs through the arrangement maintained by ILAC, and the units themselves are maintained under the BIPM. Check that the laboratory scope covers the range and quantity you need, because accreditation for one quantity does not cover another.
What Should a Calibration Certificate Contain?
A usable certificate identifies the instrument, the reference standards, the results and the uncertainty. Review each certificate when it arrives, because an unread certificate hides out-of-tolerance findings.
- Unique identification of the instrument: make, model, serial number and your asset ID.
- Calibration date, laboratory identity and accreditation reference, with a scope that covers the range you use.
- Reference standards used and their own traceability.
- As-found data and, if adjusted, as-left data, in clear units.
- Measurement uncertainty at each calibration point.
- Environmental conditions where they affect the result.
- A statement of conformity against your tolerance when you asked for one, and an authorised signature.
The next calibration date is normally set by you, not by the laboratory, so record it in your register and on the label.
What Is Test Uncertainty Ratio and Why Does It Matter?
Test uncertainty ratio (TUR) compares the tolerance you need from an instrument with the uncertainty of the calibration that checks it. A common rule of thumb is a ratio of at least 4:1, so that the calibration itself does not consume the tolerance. A worked example appears in the section on ammeter error and heat input.
How Often Should Welding Equipment Be Calibrated?
Calibration interval depends on how critical the measurement is, how heavily the instrument is used, its stability history and the manufacturer’s recommendation. Many shops start at 12 months for most instruments and adjust from results. Some NDT requirements and client specifications fix the interval, and those override shop practice.
Table 4: Typical starting intervals and between-calibration checks| Equipment | Common starting interval | Basis | Check between calibrations |
|---|
| Power source current and voltage meters | 12 months | Shop practice | Spot check with a calibrated clamp meter before critical work and after repair |
|---|
| Wire feed speed display | 12 months or after repair | Shop practice | Timed wire-length check when setting critical parameters |
|---|
| PWHT thermocouples and recorders | 6 to 12 months | Often contract | Channel check against a reference where the procedure requires it |
|---|
| Contact thermometers | 12 months | Shop practice | Comparison with a reference thermometer before use |
|---|
| Calipers, micrometers, hi-lo gauges | 12 months | Shop practice | Check against a gauge block or master; remove if worn or damaged |
|---|
| Hardness testers | 12 months | Shop practice | Verification on a reference block at the start of use |
|---|
| UT flaw detectors and probes | 12 months | Shop practice | Calibration on the required block for each examination |
|---|
| MT yokes, UV-A and white light meters | Commonly 12 months | Code or contract | Yoke lifting test and meter check as the article and edition require |
|---|
| Pressure test gauges | 6 to 12 months | Code or contract | Comparison with a master gauge before test; recalibrate if error is suspected |
|---|
| DFT gauges | 12 months | Shop practice | Shim verification before use |
|---|
The values above are starting points from shop practice, not code requirements, unless your code or contract says otherwise.
How Should You Adjust a Calibration Interval?
Adjust the interval from the calibration history of each instrument type. Guidance on this is published in ILAC-G24 and OIML D 10, which describe methods for determining calibration intervals.
- Extend carefully when an instrument type has passed several consecutive calibrations with small drift and light use.
- Shorten after an out-of-tolerance finding, heavy use, heat, dust, shock or frequent transport between sites.
- Calibrate before use after a repair, a drop, an overload or any event that may have damaged the instrument.
- Record the reason for every interval change so that an auditor can follow the logic.
How Do You Set Up a Calibration Management System?
A calibration management system is a controlled set of records, labels and procedures that keeps every measuring instrument identified, inside its calibration interval and traceable to the records it supports. Eight steps build it.
- Build the equipment register. List every welding machine, instrument and gauge that produces a recorded or accepted value. Assign a unique ID, location, owner, range, resolution and current status.
- Classify by criticality. Separate critical items, which accept product or confirm a WPS variable, from standard items and indication-only items, using a risk method such as the one in the FMEA practical guide.
- Define the required tolerance. Take the tolerance from the WPS range, the code acceptance limit or the inspection procedure, not from the instrument brochure.
- Select the calibration source. Prefer an accredited laboratory whose scope covers your range, and check that the test uncertainty ratio is adequate. In-house calibration needs a written procedure, calibrated references and trained staff.
- Set the interval and next due date. Start from shop practice or the contract, record the reason for the interval and enter the due date in the register.
- Label and control status. Mark each item with its ID, calibration date and due date. Quarantine failed or overdue items, tag indication-only items clearly and protect adjustment points from tampering.
- Add pre-use checks and record the ID. Require the instrument ID on weld, PWHT, NDT and coating records, and define a quick check before use in the WPS, ITP or inspection procedure.
- Keep records and review the system. Retain certificates, as-found data and out-of-tolerance assessments, then review intervals and findings during internal audit and management review.
Minimum register fields- Asset ID, description, make, model and serial number
- Location or custodian, including site and rental status
- Measuring range, resolution and required tolerance
- Criticality class and calibration method (external or in-house)
- Last calibration date, next due date and certificate number
- Current status: in service, quarantined, indication only or withdrawn
Who owns the system?Responsibility for equipment control normally sits with the welding coordination function described in ISO 14731, as set out in the article on welding coordinator roles and responsibilities. Name one owner for the register, and give each department a named custodian for its instruments.
Worked Example: How Does a Drifting Ammeter Change Recorded Heat Input?
An ammeter that reads low makes recorded heat input lower than the true heat input, so a weld can exceed the WPS limit while the record shows compliance. The example below quantifies the effect with the arc energy equation covered in the article on heat input in welding.
- Process: GMAW on a toughness-tested joint
- Displayed current: 220 A; arc voltage: 26 V
- Travel speed: 300 mm/min (11.8 in/min)
- WPS maximum arc energy: 1.20 kJ/mm (30.5 kJ/in)
- Calibration finds the true current is 10 % higher than displayed (an illustrative error chosen to make the effect visible)
The recorded value of 1.144 kJ/mm passes, but the true value of 1.258 kJ/mm exceeds the limit by about 4.9 %. Without a calibration check, no one would know. A look-back would have to flag every pass welded with this machine since its last good calibration.
How Is Test Uncertainty Ratio Checked in Practice?
Suppose the procedure needs the current known to within +/- 5 A at 220 A. A laboratory quoting an expanded uncertainty of +/- 1.0 A gives a good ratio, while a laboratory quoting +/- 2.5 A does not.
What Should You Do When Equipment Is Found Out of Tolerance?
When calibration shows an instrument out of tolerance, remove it from service, record the as-found data and assess every result produced since its last good calibration. The aim is to decide whether any product was accepted on a wrong reading.
- Quarantine the instrument. Tag it and remove it from use so that no further records are made with it.
- Record the as-found data. Keep the original readings and the size and direction of the error before any adjustment is made.
- Trace the affected records. Use the instrument ID to list every weld map, traveller card, PWHT chart, NDT report and coating record since the last in-tolerance calibration.
- Compare the error with the margin. For each record, check whether the error could have changed the decision, as in the heat input example above.
- Decide the disposition. Options include no impact, re-measurement, re-inspection, retest, repair, or acceptance by concession from the responsible engineer or client.
- Raise a non-conformance and find the cause. A structured method such as root cause analysis for weld failures helps separate misuse, damage and normal drift.
- Notify where required. Inform the client or inspector if the contract requires notice of out-of-tolerance equipment.
- Correct and close. Repair or adjust, recalibrate, review the interval, update the register and close the non-conformance with evidence.
Record before you adjustNever adjust an instrument before the as-found data are recorded. Adjustment erases the evidence needed to judge past results.
Quick Reference: Calibration Status Decision Flow and Pre-Use Checks
Use the flowchart as a one-page status check before any instrument is used for a recorded or accepted measurement, and the table for typical pre-use checks.
Figure 4: Decision flow for checking calibration status before an instrument is used for a recorded or accepted measurement.Table 5: Quick reference – pre-use checks and removal triggers| Instrument | Check before use | Remove from service if |
|---|
| Clamp meter or ammeter | Check battery, zero and leads; compare with a calibrated reference for critical work | Display unstable, leads damaged, label missing or overdue |
|---|
| Thermocouple and recorder | Inspect lead insulation; check the channel reading against a reference where the procedure requires it | Insulation damaged or channel reads outside tolerance |
|---|
| Hi-lo and fillet gauges | Check against a known size block; inspect contact edges for wear | Contact edges worn or bent |
|---|
| UT flaw detector and probe | Calibrate on the block required by the procedure before each examination | Cable or probe damaged, or calibration cannot be achieved |
|---|
| Magnetic yoke | Lifting test with a test weight at the specified pole spacing; Section V values are typically 4.5 kg (10 lb) for AC yokes and 18 kg (40 lb) for DC or permanent magnet yokes, depending on edition | Lifting force below the required value, or legs or cable damaged |
|---|
| UV-A radiometer and white light meter | Check the status label; take the reading at the examination surface | Calibration overdue or sensor damaged |
|---|
| DFT gauge | Check on reference shims across the working range | Shims worn or readings outside tolerance |
|---|
| Pressure test gauge | Compare with a calibrated master gauge when specified; confirm the range suits the test pressure | Pointer not at zero, glass damaged or pointer bent |
|---|
What Do Auditors and Inspectors Check for Calibration?
Auditors and inspectors check that every instrument named on a record can be identified, is inside its calibration period and was calibrated by a competent source. They usually start from a weld, PWHT or NDT record and work back to the register and the certificate.
- The instrument ID on the record matches an entry in the equipment register.
- The label is present, legible and in date on the day of use.
- The certificate covers the range actually used and shows traceability and uncertainty.
- As-found data were reviewed and any out-of-tolerance result was assessed.
- Indication-only instruments are clearly marked and not used for acceptance.
- Rental, subcontractor and site equipment are controlled in the same way as shop equipment.
- A documented pre-use check exists wherever the procedure requires one.
The equipment check is part of the pre-weld phase in the welding inspection checklist. Third-party inspectors may review calibration status before witnessing an activity, and that role is covered in the article on third party inspection in welding.
Are There Practical Notes for India and the Gulf Region?
In India, calibration laboratories accredited by NABL to ISO/IEC 17025 are a common route to traceable certificates. For projects in the Gulf region, check which accreditation bodies the client accepts, because specifications differ. Whatever the location, follow the contract wording on laboratory accreditation, maximum certificate age and the label format required on site.
What Are the Common Mistakes in Calibration Management?
The most common mistakes are administrative, not technical. Instruments are usually sent for calibration, but the results are not reviewed, linked to records or acted on.
Typical findings- Calibrating at one point when the instrument is used across a wide range.
- Relying on a machine display for critical records without checking it against an independent instrument.
- Adjusting an instrument before the as-found data are recorded.
- Keeping labels but no register, or a register that does not match the labels.
- Accepting certificates that show no traceability, uncertainty or laboratory scope.
- Having no procedure for tracing records after an out-of-tolerance finding.
- Extending intervals for convenience rather than from calibration history.
- Overlooking portable site machines, rental equipment and hand tools.
- Calibrating thermocouples but not the recorder, or the reverse, in a PWHT measuring chain.
Requirements depend on the code edition and contract specification applicable to your project, so confirm them before you fix intervals, laboratories or record formats.
Key Terms
- Calibration
- Comparison of an instrument with a traceable reference to determine its error.
- Verification
- A check that an instrument or process still meets a stated requirement between calibrations.
- Validation
- Confirmation that equipment is suitable for its intended use under real conditions.
- Traceability
- The property of a result that links it to national or international standards through an unbroken chain of comparisons.
- Measurement uncertainty
- A quantified doubt about a measured value, stated together with the result.
- As-found data
- Readings recorded on arrival at calibration, before any adjustment is made.
- Test uncertainty ratio (TUR)
- The ratio of the tolerance required to the uncertainty of the calibration.
- Out of tolerance (OOT)
- A condition in which an instrument error exceeds the permitted limit.
Frequently Asked Questions About Calibration of Welding Equipment
What is the difference between calibration and verification of welding equipment?
Calibration compares an instrument with a traceable reference and reports its error, usually with an uncertainty. Verification is a simpler check that the instrument still meets a stated requirement, such as a lifting test on a magnetic yoke or a reading on a hardness reference block. Verification is done between calibrations and does not replace them. Both should leave a record linked to the instrument ID.
Does a welding machine need calibration if it already displays amps and volts?
Yes, when the displayed values are used as records or to show compliance with a WPS. A display is indicative until it has been checked against an independent calibrated instrument. For critical procedures with narrow heat input limits, verify the display or record the values with a calibrated meter. ISO 17662 describes the approach for welding equipment, so follow the edition named in your contract.
How often should a welding machine be calibrated?
No single interval applies everywhere. Many shops start at 12 months and then adjust the interval from calibration history, usage and criticality. Some clients and NDT requirements fix the interval, and those take priority over shop practice. Calibrate before use after a repair, an overload or suspected damage, and shorten the interval after an out-of-tolerance finding.
Do PWHT thermocouples and recorders need calibration certificates?
Client specifications and PWHT procedures normally require calibrated recorders and traceable thermocouples, because the time-temperature chart is the proof that the hold requirements were met. The chart should show the instrument IDs, and the certificates should be filed with the heat treatment record. The interval is usually set by the contract, and 6 to 12 months is common in practice. Apply the same discipline to controllers and extension leads in the measuring chain.
Can a company calibrate its own instruments in-house?
Yes, if the method is documented and the reference standards are themselves calibrated by an accredited laboratory. The staff must be competent, the conditions must suit the instrument, and the uncertainty of the in-house method must be small enough for the tolerance required. Many contracts still require external calibration for critical items, so check the specification. Keep the same records you would expect from an external certificate.
What should I do if an instrument fails calibration?
Quarantine the instrument and record the as-found data before any adjustment. Use the instrument ID to find every record made since its last good calibration, and compare the error with the margin on each result. Re-measure, re-inspect or retest where the error could have changed a decision, then raise a non-conformance and review the interval. Tell the client if the contract requires it.
What does ISO 17662 cover?
ISO 17662 covers calibration, verification and validation of equipment used for welding, including ancillary activities, for use in production or on site. It also gives information for cases where other parties carry out these activities. Use it together with the quality requirements of ISO 3834 and the instructions of the equipment manufacturer. Always check the edition that applies to your project.
Conclusion
Calibration of welding equipment is a management task, not just a laboratory visit. Identify every instrument that produces a recorded or accepted value, give it a unique ID, compare it with a traceable reference at a justified interval and label its status. Read each certificate for as-found data, uncertainty and scope, and keep a tested procedure for tracing records when an instrument fails. The heat input example shows why this matters: a 10 % current error moved a weld from compliant to non-compliant with no visible sign. As a next step, add instrument IDs and calibration status checks to your inspection hold points, using the guide on how to prepare an ITP.
Standards and References
- ISO 17662, Welding – Calibration, verification and validation of equipment used for welding, including ancillary activities (ISO)
- ISO 3834-1, ISO 3834-2, ISO 3834-3 and ISO 3834-4, Quality requirements for fusion welding of metallic materials (ISO)
- ISO 14731, Welding coordination – Tasks and responsibilities (ISO)
- IEC 60974-14, Arc welding equipment – Calibration, validation and consistency testing (IEC; confirm the current edition)
- ISO 9001, Quality management systems – Requirements (ISO)
- ISO 10012, Measurement management systems – Requirements for measurement processes and measuring equipment (ISO)
- ISO/IEC 17025, General requirements for the competence of testing and calibration laboratories (ISO/IEC)
- ILAC-G24 and OIML D 10, Guidelines for the determination of calibration intervals of measuring instruments (ILAC and OIML)
- ASME Boiler and Pressure Vessel Code, Section V, Nondestructive Examination (ASME)
- ASME Boiler and Pressure Vessel Code, Section VIII, Division 1, paragraph UG-102 (ASME)
Requirements depend on the code edition and contract specification applicable to your project.
About This GuideThis guide was prepared by the WeldFabWorld technical team from the standards listed under Standards and References. Verify every requirement against the code edition and specification that apply to your project.